+61 (0) 8 9240 4357 info@processIQ.com.au

Gold Leach Kinetics

OXYGEN, CYANIDE, LEAD NITRATE & ULTRAFINE GRINDING

Overview

On many gold plants, leach performance is directly determined by gold leach kinetics: Residence times are limited – often due to throughput exceeding plant name plate capacity.

 

Why do a Gold Leach Kinetics Project?

Certain aspects of your leaching circuit need to be analysed to understand the hidden benefit in gold leach kinetcis.

There are several reasons why a gold leach kinetics project should be undertaken such as:

  • To increase gold recovery (1 to 5% range)
  • Determine if pre-Oxidation will be beneficial
  • Specify the right O2 & NaCN dosage/control equipment
  • Size the O2 equipment correctly
  • Adjust leach to optimal NaCN to DO Ratio (for max kinetics)
  • Select better setpoints for both DO and CN to optimise kinetics and reduce NaCN consumption
  • Determine feed material O2-demand and CN-demand
  • Conduct scenario calculations (leach modelling) for different feed blends – current and future

Benefits

  • Optimal adjustment of NaCN : DO Ratio
  • Reduced cyanide consumption
  • Increased throughput
  • Improved gold recovery

Consulting

Martin Verster is a consultant for Process IQ based in South Africa, specialising in Au-Leach Kinetics in leaching circuits for over 12 years.

He has provided many gold mines with reporting and insight into:
– characterisation of feed ores (O2 & CN demands)
– cyanide and oxygenation dosage systems (audit & specification) and
– determination of optimal NaCN & DO ratios to maximize kinetics

 

If you are looking for an overview of this, please contact info@processiq.com.au.

Process IQ Pty Ltd

Unit 1 / 23 Gibberd Road Balcatta

WA 6021 Western Australia

 

Tel: +61 (0) 8 9240 4357

Fax: +61 (0) 8 6316 0486

Email: info@processiq.com.au